![]() The maritime attorneys at Maintenance and Cure represent maritime workers injured in offshore oil rig, and offshore oil platform accidents in the Gulf of Mexico and across the globe. Shell has responded to the criticism, saying that it will comply with the order and will use the results of the review to avoid any such incidents in the future. The company is also required to notify the Petroleum Safety Authority when the order has been complied with. The company has been warned to refine its plans to improve well intervention and control strategies. The Petroleum Safety Authority has ordered Shell to conduct a complete review of its safety procedures by 1 June. The Petroleum Safety Authority acknowledged that it’s impossible to develop foolproof methods to prevent such incidents, but it is important to have a proper understanding of the risks that can be expected in order to prevent the loss of barriers in such incidents. Draugen field, in 250 m of water in the Norwegian Sea, has produced since 1993 through a concrete gravity platform that now serves as host facility. Stabilized oil is stored in tanks in the base of the platform. Draugen field due new subsea multiphase pump. The field has been developed using a fixed concrete platform with an integrated deck. However, according to the Petroleum Safety Authority, it did have the potential to cause serious injuries and fatalities. The well, designated as 6407/9-G-5, is located on the Shell-operated Draugen field, which is an oil field in the Norwegian Sea in 250 meters of water. The incident did not result in injuries to the offshore oil personnel. The Gullfaks C, Draugen and Troll A platforms all incorporate long skirt piles, and all have operated on the Norwegian continental shelf for more than 20 years. During a valve replacement, the valve became stuck, blocking the upper master valve, and leaving just one barrier protecting against hydrocarbon outflow from the well. ![]() Stabilized oil is stored in tanks in the base of the facility. The field has been developed with a concrete fixed facility and integrated topside. It has been operating by A/S Norske Shell until sold to AS OKEA in 2018. These would be tied back to the Draugen platform and increase reserves by about 81 million barrels or 13 million standard cubic metres (scm) of oil. Draugen is an oil field in the Norwegian Sea with a sea depth of 250 metres (800 ft). The rebuke is linked to an oil maintenance incident that occurred on Decemon Shell’s Draugen facility in the shallow waters off Norway’s west coast. To increase production from and producing life for the Draugen area even further, Shell now planned development of the Garn West and Rogn South subsea wells. The agency has ordered the company to review its safety procedures. Norway’s Petroleum Safety Authority has criticized Royal Dutch Shell over safety concerns at one of the company’s offshore oil rigs. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |